An archive of each full weekday episode of the award-winning program presented by Bruce Whitfield.
…
continue reading
内容由Share Talk and Share Talk LTD提供。所有播客内容(包括剧集、图形和播客描述)均由 Share Talk and Share Talk LTD 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal。
Player FM -播客应用
使用Player FM应用程序离线!
使用Player FM应用程序离线!
Colin Bird, Executive Chairman of Xtract Resources (XTR.L) Interview.
Manage episode 290325311 series 1128869
内容由Share Talk and Share Talk LTD提供。所有播客内容(包括剧集、图形和播客描述)均由 Share Talk and Share Talk LTD 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal。
Placing to fund accelerated
Bushranger phase 2 drilling programme
Total voting rights
Highlights
· Placing to raise £5,500,000 (before expenses)
· Contracting 2 drill rigs for an accelerated six-month, 20,000 metre drilling programme at Bushranger
· Planned recruitment of a quality exploration team and site expansion at Bushranger
· Objective of drilling is a potential 2 million tonne copper target
Bushranger Phase Two Drill Planning
Bushranger Phase Two Drill Planning
· The Company is currently modelling all of the results of the Phase One programme and integrating the results of the current geophysical programme
· Contracting the hire of two drill rigs for drilling programmes for up to six months
· Recruiting the necessary geologists for the drilling programmes
· Increase in the drill core handling and storage capacity at site
· Organising core store capability and own core cutting machinery and the logistics connected with speedy turnaround of raw data
https://www.share-talk.com/colin-bird-executive-chairman-of-xtract-resources-xtr-l-interview-2/
https://www.share-talk.com/colin-bird-executive-chairman-of-xtract-resources-xtr-l-interview-2/
1272集单集
Manage episode 290325311 series 1128869
内容由Share Talk and Share Talk LTD提供。所有播客内容(包括剧集、图形和播客描述)均由 Share Talk and Share Talk LTD 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal。
Placing to fund accelerated
Bushranger phase 2 drilling programme
Total voting rights
Highlights
· Placing to raise £5,500,000 (before expenses)
· Contracting 2 drill rigs for an accelerated six-month, 20,000 metre drilling programme at Bushranger
· Planned recruitment of a quality exploration team and site expansion at Bushranger
· Objective of drilling is a potential 2 million tonne copper target
Bushranger Phase Two Drill Planning
Bushranger Phase Two Drill Planning
· The Company is currently modelling all of the results of the Phase One programme and integrating the results of the current geophysical programme
· Contracting the hire of two drill rigs for drilling programmes for up to six months
· Recruiting the necessary geologists for the drilling programmes
· Increase in the drill core handling and storage capacity at site
· Organising core store capability and own core cutting machinery and the logistics connected with speedy turnaround of raw data
https://www.share-talk.com/colin-bird-executive-chairman-of-xtract-resources-xtr-l-interview-2/
https://www.share-talk.com/colin-bird-executive-chairman-of-xtract-resources-xtr-l-interview-2/
1272集单集
所有剧集
×欢迎使用Player FM
Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。