Built Different

分享
 

Manage series 3708911
内容由Thomas Carter and Spring Street Management Group提供。所有播客内容(包括剧集、图形和播客描述)均由 Thomas Carter and Spring Street Management Group 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction. No hype. No futurism. Just execution reality. Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models. This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do. Topics include: Why modular projects fail (and it's not the factory) Design freeze and its hidden costs Transportation as construction risk Site work that still controls the timeline Where modular actually saves money—and where it doesn't Sequencing, coordination, and the gaps between systems 3-4 minutes daily. Built for people who build. Brought to you by Spring Street Management Group.
  continue reading

1集单集

Artwork

Built Different

updated

icon分享
 
Manage series 3708911
内容由Thomas Carter and Spring Street Management Group提供。所有播客内容(包括剧集、图形和播客描述)均由 Thomas Carter and Spring Street Management Group 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction. No hype. No futurism. Just execution reality. Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models. This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do. Topics include: Why modular projects fail (and it's not the factory) Design freeze and its hidden costs Transportation as construction risk Site work that still controls the timeline Where modular actually saves money—and where it doesn't Sequencing, coordination, and the gaps between systems 3-4 minutes daily. Built for people who build. Brought to you by Spring Street Management Group.
  continue reading

1集单集

所有剧集

×
 
Loading …

欢迎使用Player FM

Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。

 

快速参考指南

版权2026 | 隐私政策 | 服务条款 | | 版权
边探索边听这个节目
播放