Trailblazing Survey Work at Fourteen Hundredths | S02E05
Manage episode 307025892 series 2855390
A nationally recognized regional trail system required a bridge in a remote section that would need to be flown in by helicopter. Frank Lehman's challenge was staking out specs for the bridge and the abutments at 70.14 feet apart with a bridge that was going to be 70 feet long. So, essentially the spec only had 14 hundredths of an inch of “slop” in order for that bridge to fit!
If you'd like more information about this project, please take a look at this article: https://www.topconpositioning.com/na/insights/trailblazing-survey-work
11集单集