Artwork

内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal
Player FM -播客应用
使用Player FM应用程序离线!

Herculean effort results in a new bridge after historic mid-Michigan flooding

24:46
 
分享
 

Manage episode 444329704 series 2920850
内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

On this week’s edition of the Talking Michigan Transportation podcast, a conversation about the extraordinary efforts that culminated with the opening of a new and improved bridge near Edenville.

Jack Hofweber, manager of the Michigan Department of Transportation’s (MDOT) Mt. Pleasant Transportation Service Center, reflects on the heavy rains and floods that breached dams and ravaged roads and bridges in several counties in 2020, just weeks after many people went into lockdown because of the pandemic.

In what meteorologists concluded was a 500-year event, the flooding that resulted from up to 7 inches of rain in Midland, Saginaw and surrounding counties damaged homes and property, forced more than 10,000 people to evacuate and most spectacularly destroyed one power dam and severely damaged another.

One year after the floods, an MLive drone video captured the changes.

On Monday, Oct. 7, MDOT Director Bradley C. Wieferich, elected officials, contractors and labor groups celebrated the opening of the new bridge, as highlighted in this video.

With climate change and sustained high water creating headaches for shoreline communities across the state and officials from several state agencies planning for more, the challenge of planning and building more resilient transportation infrastructure, especially during an ongoing period of underinvestment, remains acute.

Other relevant links:

https://www.mlive.com/news/saginaw-bay-city/2020/05/how-a-spring-rainstorm-became-a-500-year-flood-event-in-mid-michigan.html

https://www.michiganradio.org/post/governor-expands-state-emergency-declaration-include-arenac-gladwin-and-saginaw-counties

  continue reading

章节

1. Herculean effort results in a new bridge after historic mid-Michigan flooding (00:00:00)

2. Rebuilding Michigan Transportation After Flooding (00:00:08)

3. Bridge Innovations and Emergency Contracting (00:09:51)

4. Success in Michigan Transportation Podcast (00:24:04)

204集单集

Artwork
icon分享
 
Manage episode 444329704 series 2920850
内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

On this week’s edition of the Talking Michigan Transportation podcast, a conversation about the extraordinary efforts that culminated with the opening of a new and improved bridge near Edenville.

Jack Hofweber, manager of the Michigan Department of Transportation’s (MDOT) Mt. Pleasant Transportation Service Center, reflects on the heavy rains and floods that breached dams and ravaged roads and bridges in several counties in 2020, just weeks after many people went into lockdown because of the pandemic.

In what meteorologists concluded was a 500-year event, the flooding that resulted from up to 7 inches of rain in Midland, Saginaw and surrounding counties damaged homes and property, forced more than 10,000 people to evacuate and most spectacularly destroyed one power dam and severely damaged another.

One year after the floods, an MLive drone video captured the changes.

On Monday, Oct. 7, MDOT Director Bradley C. Wieferich, elected officials, contractors and labor groups celebrated the opening of the new bridge, as highlighted in this video.

With climate change and sustained high water creating headaches for shoreline communities across the state and officials from several state agencies planning for more, the challenge of planning and building more resilient transportation infrastructure, especially during an ongoing period of underinvestment, remains acute.

Other relevant links:

https://www.mlive.com/news/saginaw-bay-city/2020/05/how-a-spring-rainstorm-became-a-500-year-flood-event-in-mid-michigan.html

https://www.michiganradio.org/post/governor-expands-state-emergency-declaration-include-arenac-gladwin-and-saginaw-counties

  continue reading

章节

1. Herculean effort results in a new bridge after historic mid-Michigan flooding (00:00:00)

2. Rebuilding Michigan Transportation After Flooding (00:00:08)

3. Bridge Innovations and Emergency Contracting (00:09:51)

4. Success in Michigan Transportation Podcast (00:24:04)

204集单集

Todos os episódios

×
 
Loading …

欢迎使用Player FM

Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。

 

快速参考指南