APM ChPP - Competencies 2a. Change Control and 2b. Conflict Management

16:01
 
分享
 

Manage episode 376628131 series 42551
内容由Paul Naybour and Parallel Project Management Training提供。所有播客内容(包括剧集、图形和播客描述)均由 Paul Naybour and Parallel Project Management Training 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

In this episode, we discuss competencies, 2a. Change control and 2b. Conflict management.

The professional practice criteria for 2A. Change control;

PP1.1 Established a suitable change control process.

PP1.2 Implemented and maintained a suitable change control process.

PP1.3 Captured and recorded proposed changes to the agreed project scope.

PP1.4 Determined the high-level impact of proposed changes to the project scope including reference to relevant sources.

PP1.5 Determined the detailed impact on time and cost estimates of options relating to a proposed change.

PP1.6 Reached justified recommendations on the approval, rejection, or deferral of proposed changes to a project and updated stakeholders as necessary.

PP1.7 Updated plans and schedules reflecting the approved changes to a project demonstrating configuration management.

PP1.8 Used trend analysis to help determine the performance of the current and future projects.

The professional practice criteria for 2b. Conflict management;

PP1.1 Taken a proactive approach to identifying and addressing potential conflict situations which may have impacted on the project.

PP1.2 Taken an impartial approach to investigating the cause of conflict.

PP1.3 Evaluated and implemented conflict resolution measures, seeking assistance from others when necessary.

PP1.4 Responded appropriately and promptly to conflict situations where intervention was required.

PP1.5 Monitored the extent to which conflict resolution measures have been successful.

PP1.6 Sought to resolve conflict respecting the views, opinions, and concerns of all parties.

PP1.7 Supported others to resolve conflict.

For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.

  continue reading

111集单集

Artwork
icon分享
 
Manage episode 376628131 series 42551
内容由Paul Naybour and Parallel Project Management Training提供。所有播客内容(包括剧集、图形和播客描述)均由 Paul Naybour and Parallel Project Management Training 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

In this episode, we discuss competencies, 2a. Change control and 2b. Conflict management.

The professional practice criteria for 2A. Change control;

PP1.1 Established a suitable change control process.

PP1.2 Implemented and maintained a suitable change control process.

PP1.3 Captured and recorded proposed changes to the agreed project scope.

PP1.4 Determined the high-level impact of proposed changes to the project scope including reference to relevant sources.

PP1.5 Determined the detailed impact on time and cost estimates of options relating to a proposed change.

PP1.6 Reached justified recommendations on the approval, rejection, or deferral of proposed changes to a project and updated stakeholders as necessary.

PP1.7 Updated plans and schedules reflecting the approved changes to a project demonstrating configuration management.

PP1.8 Used trend analysis to help determine the performance of the current and future projects.

The professional practice criteria for 2b. Conflict management;

PP1.1 Taken a proactive approach to identifying and addressing potential conflict situations which may have impacted on the project.

PP1.2 Taken an impartial approach to investigating the cause of conflict.

PP1.3 Evaluated and implemented conflict resolution measures, seeking assistance from others when necessary.

PP1.4 Responded appropriately and promptly to conflict situations where intervention was required.

PP1.5 Monitored the extent to which conflict resolution measures have been successful.

PP1.6 Sought to resolve conflict respecting the views, opinions, and concerns of all parties.

PP1.7 Supported others to resolve conflict.

For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.

  continue reading

111集单集

所有剧集

×
 
Loading …

欢迎使用Player FM

Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。

 

快速参考指南