使用Player FM应用程序离线!
APM ChPP - Competencies 4a. Integrated Planning and 4b. Schedule Management
Manage episode 376628129 series 42551
In this episode, we discuss competencies 4a. Integrated planning and 4b. Schedule management
The professional practice criteria for 4A. Integrated planning
PP1.1 Considered constraints and assumptions when creating an integrated plan.
PP1.2 Considered dependencies and governance arrangements, when creating an integrated plan.
PP1.3 Demonstrated compliance with organisational practice when establishing the size, structure, and contents of an integrated plan.
PP1.4 Included other relevant components, plans and documentation to support a comprehensive integrated plan, and ensured formal acceptance of it.
PP1.5 Completed formal sign off and acceptance of an integrated plan.
PP1.6 Continually monitored the progress of a project against the integrated plan.
PP1.7 Adjusted the integrated plan utilising a change control process
PP1.8 Applied configuration management to a plan once it had been formally accepted.
The professional practice criteria for 4B. Schedule management are
PP1.1 Defined tools and techniques for creating and updating a schedule.
PP1.2 Established units of measure to accurately define activities and events to be completed during a project.
PP1.3 Developed duration estimates and critical dates for each activity and event.
PP1.4 Determined relationships and dependencies between activities and events, when constructing a schedule.
PP1.5 Documented a schedule of phases, milestones, and reviews to support project monitoring and progress reporting.
PP1.6 Agreed a schedule baseline, exceptions, and tolerance thresholds.
PP1.7 Communicated regular schedule updates to internal or external stakeholders.
PP1.8 Refined a schedule of activities based on effective monitoring, implementing the change control process when required.
For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.
111集单集
Manage episode 376628129 series 42551
In this episode, we discuss competencies 4a. Integrated planning and 4b. Schedule management
The professional practice criteria for 4A. Integrated planning
PP1.1 Considered constraints and assumptions when creating an integrated plan.
PP1.2 Considered dependencies and governance arrangements, when creating an integrated plan.
PP1.3 Demonstrated compliance with organisational practice when establishing the size, structure, and contents of an integrated plan.
PP1.4 Included other relevant components, plans and documentation to support a comprehensive integrated plan, and ensured formal acceptance of it.
PP1.5 Completed formal sign off and acceptance of an integrated plan.
PP1.6 Continually monitored the progress of a project against the integrated plan.
PP1.7 Adjusted the integrated plan utilising a change control process
PP1.8 Applied configuration management to a plan once it had been formally accepted.
The professional practice criteria for 4B. Schedule management are
PP1.1 Defined tools and techniques for creating and updating a schedule.
PP1.2 Established units of measure to accurately define activities and events to be completed during a project.
PP1.3 Developed duration estimates and critical dates for each activity and event.
PP1.4 Determined relationships and dependencies between activities and events, when constructing a schedule.
PP1.5 Documented a schedule of phases, milestones, and reviews to support project monitoring and progress reporting.
PP1.6 Agreed a schedule baseline, exceptions, and tolerance thresholds.
PP1.7 Communicated regular schedule updates to internal or external stakeholders.
PP1.8 Refined a schedule of activities based on effective monitoring, implementing the change control process when required.
For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.
111集单集
所有剧集
×欢迎使用Player FM
Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。