APM ChPP - Competencies 4a. Integrated Planning and 4b. Schedule Management

19:56
 
分享
 

Manage episode 376628129 series 42551
内容由Paul Naybour and Parallel Project Management Training提供。所有播客内容(包括剧集、图形和播客描述)均由 Paul Naybour and Parallel Project Management Training 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

In this episode, we discuss competencies 4a. Integrated planning and 4b. Schedule management

The professional practice criteria for 4A. Integrated planning

PP1.1 Considered constraints and assumptions when creating an integrated plan.

PP1.2 Considered dependencies and governance arrangements, when creating an integrated plan.

PP1.3 Demonstrated compliance with organisational practice when establishing the size, structure, and contents of an integrated plan.

PP1.4 Included other relevant components, plans and documentation to support a comprehensive integrated plan, and ensured formal acceptance of it.

PP1.5 Completed formal sign off and acceptance of an integrated plan.

PP1.6 Continually monitored the progress of a project against the integrated plan.

PP1.7 Adjusted the integrated plan utilising a change control process

PP1.8 Applied configuration management to a plan once it had been formally accepted.

The professional practice criteria for 4B. Schedule management are

PP1.1 Defined tools and techniques for creating and updating a schedule.

PP1.2 Established units of measure to accurately define activities and events to be completed during a project.

PP1.3 Developed duration estimates and critical dates for each activity and event.

PP1.4 Determined relationships and dependencies between activities and events, when constructing a schedule.

PP1.5 Documented a schedule of phases, milestones, and reviews to support project monitoring and progress reporting.

PP1.6 Agreed a schedule baseline, exceptions, and tolerance thresholds.

PP1.7 Communicated regular schedule updates to internal or external stakeholders.

PP1.8 Refined a schedule of activities based on effective monitoring, implementing the change control process when required.

For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.

  continue reading

111集单集

Artwork
icon分享
 
Manage episode 376628129 series 42551
内容由Paul Naybour and Parallel Project Management Training提供。所有播客内容(包括剧集、图形和播客描述)均由 Paul Naybour and Parallel Project Management Training 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

In this episode, we discuss competencies 4a. Integrated planning and 4b. Schedule management

The professional practice criteria for 4A. Integrated planning

PP1.1 Considered constraints and assumptions when creating an integrated plan.

PP1.2 Considered dependencies and governance arrangements, when creating an integrated plan.

PP1.3 Demonstrated compliance with organisational practice when establishing the size, structure, and contents of an integrated plan.

PP1.4 Included other relevant components, plans and documentation to support a comprehensive integrated plan, and ensured formal acceptance of it.

PP1.5 Completed formal sign off and acceptance of an integrated plan.

PP1.6 Continually monitored the progress of a project against the integrated plan.

PP1.7 Adjusted the integrated plan utilising a change control process

PP1.8 Applied configuration management to a plan once it had been formally accepted.

The professional practice criteria for 4B. Schedule management are

PP1.1 Defined tools and techniques for creating and updating a schedule.

PP1.2 Established units of measure to accurately define activities and events to be completed during a project.

PP1.3 Developed duration estimates and critical dates for each activity and event.

PP1.4 Determined relationships and dependencies between activities and events, when constructing a schedule.

PP1.5 Documented a schedule of phases, milestones, and reviews to support project monitoring and progress reporting.

PP1.6 Agreed a schedule baseline, exceptions, and tolerance thresholds.

PP1.7 Communicated regular schedule updates to internal or external stakeholders.

PP1.8 Refined a schedule of activities based on effective monitoring, implementing the change control process when required.

For more guidance on the Association for Project Management Chartered Project Professional (ChPP), or any other project management training, please visit www.parallelprojecttraining.com or call 0118 321 5030.

  continue reading

111集单集

所有剧集

×
 
Loading …

欢迎使用Player FM

Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。

 

快速参考指南