Molecular Design and the Critical Path Problem
Manage episode 158032756 series 1240802
内容由Issues and Innovations in Drug Development presented by Aptuit提供。所有播客内容(包括剧集、图形和播客描述)均由 Issues and Innovations in Drug Development presented by Aptuit 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal。
In this episode, Dr. Stephen Byrn, Head of Aptuit Scientific Advisory Board, speaks about the critical path problem in drug development and how a designed molecular delivery system can improve the drug development process.
…
continue reading
3集单集