使用Player FM应用程序离线!
Company Planning at Buildings
Manage episode 155716902 series 1166151
Weekly Company Drill
Building Familiarization
This drill is a size up and familiarization drill. It can be broken up into several parts and get as much information gathered as possible.
The objective of this drill is to identify specific hose length stretches for large complexes or buildings that may test the ability of your typical 150' or 200' pre-connect hose line. Share your information with the other companies.
Instructions
Gather some utility or search rope. We use three, 100 foot sections of 9mm search rope in a bag. Park where you would normally park if there were an incident. Tie off at the truck and stretch to the most remote area you can access. We tie off knots every 25 feet to help us figure out how far we are. Document distances going up stairs, over hand rails, special considerations, etc. Stretch to the back simulating a large blitz line.
Special Considerations
- Access issues for apparatus
- Water supply location and challenges
- Forcible Entry
- Floor plan challenges
- Rear and remote access points
- Utilities
- Friction loss and flow rates
- Ventilation considerations
- Occupancy type and demographics
- First due resources
- Construction type and associated challenges
- Proficiency with deployment of dead or static loads
- Get the permission of the property owner
Special note: If we cannot get into an apartment, we take the distance to the front door of the apartment and then measure the full length of the apartment from the exterior, approximating the interior stretch.
50集单集
Manage episode 155716902 series 1166151
Weekly Company Drill
Building Familiarization
This drill is a size up and familiarization drill. It can be broken up into several parts and get as much information gathered as possible.
The objective of this drill is to identify specific hose length stretches for large complexes or buildings that may test the ability of your typical 150' or 200' pre-connect hose line. Share your information with the other companies.
Instructions
Gather some utility or search rope. We use three, 100 foot sections of 9mm search rope in a bag. Park where you would normally park if there were an incident. Tie off at the truck and stretch to the most remote area you can access. We tie off knots every 25 feet to help us figure out how far we are. Document distances going up stairs, over hand rails, special considerations, etc. Stretch to the back simulating a large blitz line.
Special Considerations
- Access issues for apparatus
- Water supply location and challenges
- Forcible Entry
- Floor plan challenges
- Rear and remote access points
- Utilities
- Friction loss and flow rates
- Ventilation considerations
- Occupancy type and demographics
- First due resources
- Construction type and associated challenges
- Proficiency with deployment of dead or static loads
- Get the permission of the property owner
Special note: If we cannot get into an apartment, we take the distance to the front door of the apartment and then measure the full length of the apartment from the exterior, approximating the interior stretch.
50集单集
所有剧集
×欢迎使用Player FM
Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。